Pump-solutions-group Neptune Solenoid-driven Diaphragm Metering Pump AR Manuel d'utilisateur Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 56
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
27
Operation
Air releasing
(1) Before proceeding with the air releasing, check that the end of the air-release hose has been led back to the tank or
other container.
(2) Turn off the pump’s power, and release the pressure inside the discharge-side pipe.
(3) Set the discharge volume to the maximum level. (See page 28)
(4) Turn on the pump’s power to start operating the pump.
(5) After a few moments air will exit from the air-release port together with the liquid.
(6) After all the air has been released, shut down the pump.
Air-
release
port
Air-release hose
Air-release knob
(1) Insert the air-release hose provided into the air-release port.
(2) Return the other end of the air-release hose to the tank or other container, and secure it firmly.
(3) Turn off the pump’s power, and release the pressure inside the discharge-side pipe.
(4) Set the discharge volume to the maximum level. (See page 28)
(5) Turn on the pump’s power to start operating the pump.
(6) While operating the pump, turn the air-release knob counterclockwise for 1 to 1-1/2 turns.
(7) After a few moments air will exit from the air-release port together with the liquid.
(8) After all the air has been released, turn the air-release knob clockwise, and tighten it securely.
(9) Shut down the pump.
NOTE
• If it is difficult to release the air completely, repeatedly open and close the air-release knob.
Model w/ automatic air-release function for injection of sodium hypochlorite: ARPZ-31/61/12
Model for injection of sodium hypochlorite: PZ-31/61/12-CL
23-28_PZ総合取説_E.indd 2723-28_PZ総合取説_E.indd 27 2008/02/01 9:32:172008/02/01 9:32:17
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 55 56

Commentaires sur ces manuels

Pas de commentaire